A major Australian Data Centre completes Cooling System Review through 26 Simultaneous Flow Measurements.
Clamp-on ultrasonic flow monitoring equipment was used for the study of chilled water flows.
Clamp-on ultrasonic flow monitoring equipment was used for the study of chilled water flows.